- Snowden Optiro Podcasts & News, Tech talk
30 Seconds of Info from Paul Blackney – resource estimation
Every step of the resource estimation process should be validated in some way: While this may sound onerous and time consuming, it doesn’t need to be. For instance, check the downhole compositing process by determining the total sample length before and after compositing – it should be the same or nearly the same. The cause of any difference should be determined and either corrected or understood before proceeding.
This week’s 30 Seconds of Info comes from Paul Blackney – Principal Consultant. pblackney@snowdenoptiro.com
You can follow Optiro on LinkedIn to view these weekly 30 Seconds of Info.
Share the Post:
Related Posts
We provide a lot of great technical content for free!
Subscribe here for our podcasts, technical articles and news