BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.17.1//EN
X-ORIGINAL-URL:https://snowdenoptiro.com/
X-WR-CALNAME:Snowden Optiro
X-WR-CALDESC:Unlock Latent Value
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-d0dcf063a9c7678ef849da47e7b5c359@snowdenoptiro.com
DTSTART:20220523T000000Z
DTEND:20220526T150000Z
DTSTAMP:20230302T153300Z
CREATED:20230302
LAST-MODIFIED:20230927
PRIORITY:5
SEQUENCE:4
TRANSP:OPAQUE
SUMMARY:Long Term Mine Planning – Online course
DESCRIPTION:\nOn-demand course as Inhouse training for mining companies.\nPresenter: Matt Mullins – Executive Consultant\n\n\n\nThis 2-day Online course will be presented as 4 x 3-hour training sessions over 4-consecutive days.\nCourse starting time each day is 08:00 am GMT.\nPrice: US$1,400 per person exclusive of taxes.\nPresenter and Course Developer: Matt Mullins – Executive Consultant\n16 CPD HOURS\n\nThis comprehensive 2-day course shows you how to plan and execute a long term mine plan. The course includes the organization of the inputs, development of the mining strategy, optimising the mine, and development of the mine plans and schedules.\nThis course is also available as Inhouse Online training for your team, on dates that suit your team. Please contact training@snowdenoptiro.com ( mailto:training@snowdenoptiro.com ) for a quote.\nCourse outline:\nData review:\nWhat to review on commencement of a Life of Mine Plan, including topography surfaces, the block model, geological wireframes, existing/previous work/reports, covering the following disciplines:\n\nGeo-mechanics\nClimate, seismic\nHydrogeology/hydrology\nOHS,\nEnvironment and community\n\nSite visit requirements:\n\nWhat to look for in a site visit\nDocumentation and site visit report\n\nMining operations strategy:\n\nSite layout review, location of haul roads, stockpiles and waste dumps\nWet season mining strategy\nStockpiling strategy, cut-off grades\nEquipment selection\nMine to mill strategy including selection of the ore feed blend, including grade control, stockpiling, homogenising, and run of mine (ROM) pad sizing and management\n\nPit optimisation:\n\nPreparation of inputs\nThe model\nGeotechnical parameters\nMining dilution\nRecoveries\nSelection of financial parameters such as price and discount rates\n\nDetailed design:\n\nPit design\nWaste dump design\nBackfill\nRamps and sumps\nMaximising grade in the early years\n\nLife of mine schedule:\n\nMining inventory estimation\nLife of mine (LoM) mining schedule, incorporating grade constraints, deposit sequencing, practicality, waste planning, backfilling, sheeting, weather and economics\nHaulage estimates\nDrill and blast estimates\n\nFive-year plan and two-year budget:\n\nMining inventory estimation\nLife of mine (LoM) mining schedule, incorporating grade constraints, deposit sequencing, practicality, waste planning, backfilling, sheeting, weather and economics\nHaulage estimates\nDrill and blast estimates\n\nTechnical reporting:\n\nReporting of Ore Reserves according to regulatory requirements\n\nDuration (in days)\n2 days presented as 4 x 3-hour Online training sessions. Starting time each day of 08:oo am GMT\nPrices in US$ and exclusive of GST/VAT\nIn-house /Online or Onsite training is a cost-effective way of getting your whole team trained. Please email Diana Ross our Training Manager training@snowdenoptiro.com ( mailto:training@snowdenoptiro.com ) for a quote or further information.\n\n\n\n
URL:https://snowdenoptiro.com/events/long-term-mine-planning-online-course/
ORGANIZER;CN=Snowden Optiro:MAILTO:
CATEGORIES:Online - UK
LOCATION:Online
END:VEVENT
END:VCALENDAR
